PETRONAS MALAYSIA – Garraf Power Plant 2010

PETRONAS Garraf Base Camp, Iraq

2010  2nd project refinery power station  plant 

The project was desinged to synchrnization cat.  14 generators dual fuel engine (diesel and natural gas) we use the land field gas to save fuel .

we used  step-up transformer to 6.6 KV  with schneider MV gear switch to supply  all oil filed with power with full power management and fuel optimization and shair  with GAS up to 65  and 35 % diesel this save 60 % of run cost of fuel

  • The first phase started in august 2010.
  • 2nd phase start in 2011